| Some Executed Jobs
|
![]() |
|
Geoville Consulting
Limited
has successfully helped its clients
completed a number of projects.
These projects ranging from
Borehole Drilling and Completion,
Geotechnical Study & Geophysical Survey,
Water Treatment,
Storage and
Distributions
networking all over the country, particularly in Niger Delta
and South Western part of Nigeria.
|
|
LIST OF BOREHOLE DRILLING & COMPLETION EXECUTED
|
S/N |
Project Name |
Status |
|
1. |
Provision of water facilities with treatment system
for Chartered Bank Plc, Port-Harcourt Branch Plot
#7 Trans- Amadi industrial layout, Port Harcourt |
Completed |
|
2. |
Provision of water
facilities with treatment system and distribution
network for Centre For Technology Policy, School and
Guest House at 55/57 Apara road, Off Evo Road, G.R.A,
Phase 1 Port Harcourt. |
Completed |
|
3. |
Provision of Six
inches Borehole with treatment facilities at Quicy
Herbal Slimmer home, 19 Ohaeto Street, D-line, Port
Harcourt |
Completed |
|
4. |
Provision of water
facilities and distribution network for Greenville
Properties and Investment Company Limited 14
Elelenwo Street G.R.A, Phase 1 Port Harcourt |
Completed |
|
5. |
Provision of water
facility with treatment system for Isagba
Chambers, 21A Obianwu Street, Onitsha, Anambra
State in their office premises and also their
residential quarter |
Completed |
|
6. |
Reactivation of an
abandon water facility for Greenville Properties and
Investment Company Limited, 14 Elelenwo street G.R.A,
Phase 1 Port Harcourt in their Sixty (60) housing
unit estate, Iriebe, Port-Harcourt |
Completed |
|
7. |
Drilling of 10 inches
hole, 8 inches casing, 300 metres depth borehole,
provision of water storage facility and distribution
network for Obodhi community, Ahoada West Local
Government area of Rivers State. Nigerian Agip Oil
Company community project. Subcontract from Moonepat
Nigeria Limited. |
Completed |
|
8. |
Drilling of 10 inches
hole, 8 inches casing, 300 metres depth borehole,
provision of water storage facility and distribution
network for Ogba/Ndoni/Egbema Local secreatariat,
Omoku, Rivers State. Nigerian Agip Oil Company
community project. Subcontract from Fezinat Nigeria
Limited. |
Completed |
|
9. |
Drilling of 10 inches
hole, 8 inches casing, 300 metres depth borehole,
provision of water storage facility, provision of
water treatment system and distribution network for
Ofoinegbene community, Bayelsa State. Nigerian Agip
Oil Company project. Subcontract from Nigerbukh
Nigeria Limited |
90% Completed |
|
10. |
Drilling of 8 inches
hole, 6 inches casing, 100 metres depth borehole
Basement Complex formation, provision of water
storage facility and distribution network for Bagbe
community, Ondo East Local Govt. area, of Ondo
State. FGN/EC Micro Project Programme For 6 States
(MPP6)community project |
On going |
|
11. |
Drilling of 10 inches
hole, 8 inches casing, 300 metres depth borehole,
provision of water storage facility and distribution
network for Asemoke community, Kwale Area, of Delta
State. Nigerian Agip Oil Company community project.
Bought over from Benny Pavilion Nigeria |
On going |
|
|
LIST OF
GEOPHYSICAL SURVEY AND GEOTECHNICAL STUDY PROJECTS
EXECUTED
|
S/N |
Project Name |
Status |
|
1. |
Site Investigation
of proposed ¾ storey building for Thorst Nigeria
Limited at waterlogged area, Liberation Stadium road
Port–Harcourt |
Completed |
|
2. |
Soil Investigation
for the proposed Technical College and Town Hall
Project in Bonny for Nigeria Liquefied Natural Gas –
Subcontractor from Polak Nigeria Limited |
Completed |
|
3. |
Consultancy services
for Eadro Ventures Nigeria Limited on Geotechnical
Site Investigation at Krakama flow station for
Plant upgrade, Shell Petroleum Development Company
Project. |
Completed |
|
4. |
Sand search of Elelewon Creek to estimate the
quality and quantity of the sand reserve of the area
for Solar Associate Nigeria Limited, Aba road,
PortHrcourt |
Completed |
|
5. |
Soil investigation
for Shoreline Protection at Shell Petroleum
development Company location, Akiama Village Bonny –
subcontract from Ikonobo Nigeria. |
Completed |
|
6. |
Geo-technical site
investigation at Ogbainbiri flow station, for
installation of new equipment for plant upgrade,
Nigerian Agip Oil Company Project - subcontractor
to Eresere and company Nigeria Limited. |
Completed |
|
7. |
Geo-technical site
investigation at Tebidaba flow station, for
installation of new equipment for plant upgrade,
Nigerian Agip Oil Company Project - subcontractor to
Eresere and company Nigeria Limited. |
Completed |
|
8. |
Geo-technical site
investigation at Obama flow station, for
installation of new equipment for plant upgrade,
Nigerian Agip Oil Company Project -subcontractor to
Eresere and company Nigeria
Limited
|
Completed |
|
9. |
Geophysical survey
of Bonny terminal for Utility, Fire and Portable
water well development, Bonny terminal integrated
project, Contract awarded by Hyundai Heavy
Industries Limited, Woji road, GRA Port-Harcourt |
Completed |
|
10. |
Geophysical survey
of Bagbe Community, Ondo East Area of Ondo State to
locate the best point for borehole location and to
also determine the best aquifer horizon of the area
for Portable water well development, FGN/EC Micro
Project Programme for six state. |
Completed |
|
|
LIST OF
WATER TREATMENT PROJECT EXECUTED
The table
below shows the list of water treatment project executed
inconjuction with our oversea technical partner
KMA AND
ASSOCIATES INC
Chicago, Illinois
60640-4619 U.S.A
the
purpose of this proposal.
|
S/N |
Project Name |
Status |
|
1. |
Kula Water Project,
Rivers State, Community water treatment |
Completed |
|
2. |
Belema Water
Project, Rivers State, Project camp water treatment |
Completed |
|
3. |
Opobo Water Project,
Rivers State, Community water treatment |
Completed |
|
4. |
Yenaka Water
Project, Bayelsa State, Community water treatment |
Completed |
|
5. |
Orlando Court Water
Project, Rivers State, Residential water treatment |
Completed |
|
6. |
NPA Quarters Water
Project, Rivers State, Camp water treatment |
Completed |
|
7. |
Bosun Ayinde Water
Project, Lagos State, Residential water treatment |
Completed |
|
8. |
Ojemaie Foods Water
Project, Rivers State, Food factory water treatment. |
Completed |
|
9. |
Botem Water Project,
Ikorodu Lagos State, Water packaging Co. treatment |
Completed |
|
10. |
Tein George Water
Project, V/Island Lagos, Residential water treatment |
Completed |
|
11. |
Niger Delta Basin,
Rivers State, Residential water treatment |
Completed |
|
12. |
Shell Petroleum
Company, Rivers State, P.O.U Installation Treatment. |
Completed |
|
13. |
Nkoro Water Project,
Rivers State, Rehab. of existing water facility. |
Completed |
|
14. |
Oporoma Water
Project, Rivers State, Community Water treatment |
Completed |
|
15. |
Daisy Water Factory
, Rivers State, Water packaging Co. treatment |
Completed |
|
16. |
Jenny Water Factory,
Rivers State,
Water packaging Co.
treatment |
Completed |
|
17. |
T.K Industry Water
Factory, Rivers State,
Water packaging Co.
treatment |
Completed |
|
18. |
Bonny terminal (BTIP)
water project,
Water packaging Co.
treatment |
Completed |
|
19. |
Ofoinegbene
community water project, Community Water scheme |
90% Completed |
|
|
|